TOWN OF TROY

BOARD OF APPEALS RESOLUTION 2011 - 01

 

CONCERNING THE REPAIR OR REPLACEMENT OF CERTAIN EXISTING,

 FAILING, PRIVATE ON-SITE WASTEWATER TREATMENT SYSTEM

 IN THE LOWER ST. CROIX RIVER RURAL RESIDENTIAL MANAGEMENT

 OVERLAY DISTRICT IN THE TOWN OF TROY

 

WHEREAS, St. Croix County ("County") and the Town of Troy ("Town") have enacted and enforce separate zoning ordinances regulating land use and structures in the Lower St. Croix River Rural Residential Management Overlay District (the "District"); and

 

WHEREAS, the County treats private on-site waste water management systems ("POWTS") as a use accessory to a single-family home while the Town treats such POWTS as accessory structures; and

 

WHEREAS, because of this distinction and because of the zoning regulations protecting slope preservations zones, the repair or replacement of POWTS in certain areas of the District will require a Town variance plus County zoning and sanitary permits; and

 

WHEREAS, the soils, surface and ground waters in the District are best protected by the prompt and responsible review process, followed by the repair to or replacement of an existing, failed residential POWTS.

 

NOW, THEREFORE, BE IT RESOLVED, THAT:

 

A)        Owners of property located in the Town's Lower St. Croix River Rural Residential Management District ("the District") that is:

            1.         Used for single family residential purposes;

            2.         Has a failing POWTS that requires repair or replacement; and

            3.         Requires a variance from the requirements of the Town's St. Croix Riverway Zoning Ordinance ("LRZO") to undertake the required POWTS repairs or replacement because the POWTS is:

            a)         located in slope preservation zones; or

            b)         otherwise determined to be a non-conforming accessory structure under the LRZO;

may henceforth receive a variance for that purpose without a hearing before the Board of Appeals on their specific application, following an administrative determination by the Town Engineer that the application meets all the criteria, findings and conclusions set out in this Resolution and the LRZO.  Property owners seeking to use this procedure shall first provide the Town Engineer with the information and documentation required under paragraph B) of this Resolution.  The Town Engineer must be able to determine from the materials provided by the applicant that all applicable requirements of the LRZO will be met before, during and after POWTS repair or replacement in order to issue the variance authorized by this Resolution.

 

B)        Property owners seeking a variance through the procedure in this resolution must provide the Town Clerk/Treasurer with the required fee and two copies of the following information and documentation:

            1.         The County/State sanitary permit and County land use permit authorizing the repair or replacement of the existing, failed, residential POWTS;  

            2.         All site plans and detailed scale drawings of the area served by the existing, failed, residential POWTS and provided to the County;

            3.         The grading and erosion control plans showing grading limits and provided to the County;

            4.         The vegetation plan provided to the County;

            5.         The project contractor's project schedule; and

6.         At least six different ground level photographs of the existing vegetation in the project area and the property and that clearly identify all proposed changes to the existing vegetation as a result of the project.

 

C)        The Board of Appeals hereby delegates its authority under LRZO section 171-M.2. to the Town Engineer, to issue variances for the repair or replacement of failing single family POWTS anywhere in the District when the Town Engineer is able to determine from the application materials provided that before, during and after the repair or replacement of the existing, failed, residential POWTS:

            1.         The filling and grading activities described in the application will disturb less than 10,000 square feet of area in any slope preservation zone;

            2.         No wetlands will be filled or graded;

            3.         All vegetation removed during any filling and grading is replaced with native vegetation;

            4.         All filling and grading activities are designed and will be implemented in a manner that will minimize erosion, sedimentation and impairment of fish and wildlife habitat;

            5.         All filling and grading is visually inconspicuous and;

            6.         As part of an erosion control plan for the site, all applicable portions of the Wisconsin Construction Site Erosion Technical Standards and Wisconsin Post-Construction Stormwater Technical Standards as included in Wisconsin Department of Natural Resources' Stormwater Management Standards are implemented to control erosion.

 

D)        In support of its delegation of authority to the Town Engineer to administratively issue variances for the repair or replacement of existing, failed, residential POWTS meeting the criteria set forth in this Resolution, the Board of Appeals finds and concludes that when a LRZO variance is sought to repair or replace an existing, failing single family residential POWTS under the circumstances described in paragraph A) of this Resolution:

            1.         Expedited processing by the Town that follows County sanitary and land use permit issuance for the same purpose is not contrary to the public interest and supports the responsible continuation of a pre-existing use by allowing for the repair or replacement of a failed, residential POWTS presently serving a residence.

            2.         The inability to use a single family residence when an existing POWTS fails is a special condition such that literal LRZO enforcement by following the full variance procedure upon receipt of a County sanitary permit and land use permit for the same purpose can result in unnecessary hardship to the residents and the delay can increase the risk of surface, groundwater and River water pollution.

            3.         Requiring full compliance with Town LRZO regulations after receiving a County sanitary and land use permit for POWTS repair or replacement is unduly burdensome because of the surface, groundwater and River water pollution that can occur during the additional Town review period otherwise required. 

            4.         Prompt repair or replacement of a failed, existing, residential POWTS puts property in compliance with other important state and local regulations designed to protect surface, ground and river water from pollution and, in that way, protects the public interest and that of adjacent property owners and protects the scenic, recreational and natural values of the St. Croix River Valley.

 

E)        As additional support for its delegation of authority to the Town Engineer to administratively issue qualifying variances, the Board of Appeals finds and concludes that when a LRZO variance is sought to repair or replace an existing, failing, single family residential POWTS under the circumstances described in paragraph A) of this Resolution:

            1.         The lengthy County and Town review procedures required effectively and unreasonably prevent property owners from use of their property for a permitted purpose and in that way create hardship.

            2.         The public interest is not harmed if this Board of Appeals prospectively authorizes variances for any single family residence whose POWTS requires repair or replacement and delegates to the Town Engineer the authority to issue the variance under the circumstances described in this Resolution, where doing so allows an existing use to continue without expansion and since current standards for the operation of a residential POWTS are such that the surface, ground and River waters will be better protected after repair or replacement than if the existing, failed system is not repaired or replaced.

            3.         The information requirements for administrative variance processing as set forth herein provide sufficient information to allow for an administrative determination that the applicable core concerns of the Ordinance will be met in individual cases.

            4.         A repaired or replacement single-family residential POWTS is visually inconspicuous from the River due to the nature of the structure's installation underground, and the requirements of vegetation plans.

            5.         Best management practices concerning erosion control and surface water degradation are followed when the plans required by this Resolution are followed and a failing single family POWTS is installed or repaired in accordance therewith.

            6.         The effect on the neighborhood is positive and property values are stabilized when the adverse effects of an existing, failed, residential POWTS are promptly repaired or the system replaced.

 

F)        The regular LRZO application review fee should be paid to the Town Clerk/Treasurer for the administrative processing by the Town Engineer of an application for a variance for the repair or replacement of an existing, failed residential POWTS.  The concept review fee should be waived. 

 

G)        The Town Engineer is authorized to issue the variance authorized by this Resolution on behalf of the Board of Appeals only for those applications that meet all standards and requirements in paragraphs A), B), and C) of this Resolution, including all qualifying and pending applications at the time the Resolution is approved.   All other applications to repair or replace an existing, failed, residential POWTS shall be decided by the Board of Appeals.

 

H)        The Town Engineer shall provide a report to the Board of Appeals on the administration of this delegation of authority to issue variances for the repair or replacement of existing, failed residential POWTS during October of 2012, with any recommendations for improvement of the process.

 

 I)        This procedure can be used only for a stand-alone project for the repair or replacement of existing, failed, residential POWTS.  Full Town review and processing under its LRZO is required for all applications that include a POWTS repair or replacement application as part of a project for which additional Town approvals are necessary under the LRZO, or as part of a building permit application affecting property located in the District.

 

 

Dated this _______ day of _____________, 2011.

 

 

Approval by the Board of Appeals:

 

 

_____________________________________

Raymond H. Knapp, Chair