TOWN OF
PARK BOARD MEETING
Tuesday June 30, 2009
7:00 pm,
|
Members
Present: |
Jill
Berke, Charlie Macdonell, Brian Schwab, Greg Small, Eric Starr, and Jim
Freund |
|
Members
Absent: |
Mark Daun
(excused) |
|
Others
Present: |
Mel Hermansen, Town Constable, Vince Thao, Eagle Scout
Candidate, Sam Thao, Bryce Dierke, Eagle Scout Candidate, Steve Dierke |
Call to Order
Chair Berke
called the June 30, 2009 meeting of the Town of
Adoption of Agenda
Member
Macdonell moved to adopt the agenda; second by Schwab. Motion was unanimously carried.
Approval of Minutes
Minutes of
the May 26, 2009 Park Board meeting (prepared by Eric Starr) were
reviewed. Member Macdonell moved to
approve the minutes; second by member Freund.
Motion unanimously carried.
Review of Park Revenue/Expenditures
through June 29, 2009; Approval of Invoices/Impact Fees
The park
revenue and expenditures, through June 29, 2009, as prepared by the Town Clerk,
were reviewed. Income to date was $3,921.30;
expenses were $10,403.54. Capital
expenditures were $4,730.91. Member
Macdonell prepared a spreadsheet detailing the summary values submitted by the
Town Clerk. Member Schwab moved to
approve the income and expenditures through June 29, 2009 as tabulated by the
Town Clerk, second by Freund. Motion
carried unanimously.
Impact fees
available were $81,213.72 and County Park Funds were $94,065.19.
Constable/Park
Ranger Report
The
Constable/Park Ranger Report was reviewed.
The Constables reported relatively light usage of
Update on Eagle
Scout Project – Trail Marking, Vince Thao
Vince Thao
has placed marking tape at proposed trail marking locations. These locations have been approved by Member
Small.
¨ Trail marker plates will be diamond
shaped aluminum plates with colored reflective film adhered to the surface,
each trail having its own color.
¨ The marker plates will be nailed to
trees where feasible using minimum 3” galvanized nails.
¨ Trail intersection marking posts
will identify trails by color and name.
¨ Summit Loop trail will also be
signed by Thao.
¨ Thao will generate a materials list
at Menards and have the Town Road Crew purchase the materials.
¨ Current plans are to begin the
project on or about July 9, 2009.
Update on Eagle Scout
Project – Trail Kiosk and Pavilion Staining, Bryce Dierke
¨ Dierke has modified the design of
the kiosk in accordance with Board comments.
The revised design will be consistent with the trail shelter installed
northwest of the North Ball Field.
¨ Dierke will contact Connor Roe to
determine what stain he used for the NW Trail Shelter, as Dierke will consider
a stain similar in color.
¨ The pavilion will be stained with a
similar stain color as the trail shelter and new kiosk.
¨ Current plans are to begin the
project in late July 2009.
Park &
Recreation Reports
Cove Boat Ramp
Heavy usage, especially on weekends.
Rip rap repairs are waiting on Cedar Corp. and contractors’
estimates. Rip rap repairs are needed
below the water line along the edge of the concrete ramp and above the water
line on the north side of the ramp. In
addition, Cedar Corp. is planning the repair/realignment of the concrete ramp
panels.
The Town is considering realignment of Cove Road south of
the ramp to provide for better sight lines and a safer intersection. The Park Board supports efforts to improve
the safety of the intersection.
Glover Park
A. Update of North Ball Field
construction projects – Schwab/Macdonell
Equipment shed has been acquired and ball associations plan
to complete installation soon.
B. Status, updated park and trail map –
Daun
Member Daun was not able to attend the meeting. The Board would like to delete all tree
symbols from the map, add a North arrow, add the parking lots/drive (if not on
the map), and a “you are here” arrow.
Discussion and consensus to “color mark” the trails on the engraved map
to correlate with the coded trail markers.
Member Small volunteered to
“color in” with appropriate paint medium by hand onto the engraved
prototype trail map that Daun previously created at his workplace, Preco Laser.
C. Report of trail extension completion
“Summit Loop” trail has been completed. Trail Source has submitted an invoice for the
trail construction, in the amount of $2,185, as quoted.
D. Update of potential Eagle Scout
project – Sam Green, Troop 140 – Small
Member Small has not had further
contact from Sam Green since the initial meeting in May.
E. Update report, playground equipment
inspection and compliance – Berke & Schwab
Repairs to existing equipment will cost $1149 for parts
(spiral slide yellow hood entrance replacement section, and 16” kick plate) and
shipping, with installation to be completed by the Town crew. The accessibility ramp from the pavilion to
the playground equipment should be reconstructed in 2010. Additional sand is needed to bring the grade
to an appropriate elevation to be in compliance with the equipment fall height
and critical height requirements. Member Starr, with help from member Small
will determine how much sand is necessary to bring grade elevations up.
F. Review Request For Proposal for new
playground equipment – Schwab/Berke
The RFP was reviewed by the Board. Minor modifications to the format were
recommended. In addition, sections on
payment terms (paid upon satisfactory completion) and warranty should be added.
G. Update report, Park Entrance garden
grant – Berke
Chair Berke was awarded a grant in the amount of $295.00
from the St. Croix Valley Master Gardener’s Association for the installation of
shrubs near the park entrance sign.
Member Freund volunteered to work with Chair Berke to install planting
this summer.
H. Update report, water pump
maintenance and use
Some repairs have been conducted by the Town Crew and Hoyer
Well. However, the hand pump is still
not very user friendly. Member Small
will contact several well contractors to determine if there is a more user
friendly alternative than the currently existing unit.
I.
Discussion, vegetation overgrowth on some trails
Several
trails are experiencing significant overgrowth of brush. Member Freund will contact the Town Crew to
determine if they can assist with some brush removal.
Pemble’s Access
None.
Review of 2009
Budget
Member Macdonell
prepared a detailed spreadsheet showing the expenses against budget for each
month, as well as running totals. This
spreadsheet will be updated monthly to provide greater level of detail for
Board review.
Discussion of Board
Member Term Renewals
Terms for
Chair Berke and Member Daun end August 9, 2009.
Member Small moved to recommend to the Town Board to renew the terms of
Berke and Daun, second by Starr. Motion
carried unanimously.
Discussion,
acknowledgement to Randy Lau for volunteer efforts – ball field project
Member
Schwab will prepare some text for a certificate and/or plaque for Board member
review in July.
Correspondence
None.
Announcements
None.
Adjournment
Member
Macdonell moved to adjourn the meeting, second by Freund. Motion unanimously carried. The June 30, 2009 meeting of the Town of Troy
Park Board was adjourned at 10:20 PM.
Respectfully submitted:
Gregory L.
Small
Secretary
Town of
Troy Park Board